A multidimensional decisions modeling framework for built space supply
DOI:
https://doi.org/10.5198/jtlu.v6i3.350Keywords:
Built space supply, integrated urban systems, choice modellingAbstract
The spatial and temporal distribution of built space supply plays an important role in shaping urban form and thus the general travel pattern in an urban area. Within an integrated framework, we are interested in modeling the decisions of a builder in terms of when, where, what type, and how much built space to build. We present a multidimensional discrete-continuous model formulation for the built space supply decisions that are based on expected profit maximization. The framework is applied to estimate a model for supply of new office space in the greater Toronto area (GTA) for the 1986 to 2006 period. To our knowledge, this work is the first that models the where, when, how much, and what type of office space to build in a single econometric framework at a fairly disaggregate spatial zoning system. The results indicate risk taker behavior on the builders’ part, while market conditions and supply of resources (labor, construction cost, etc.) are also found to be important factors in decision making.Downloads
Published
How to Cite
Issue
Section
License
Authors who publish with JTLU agree to the following terms: 1) Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under Creative Commons Attribution-Noncommercial License 4.0 that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal. 2) Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal. 3) Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.